Greeley Boulevard is closed at Rolling Road until late November, and a Burke Centre Parkway left turn onto Route 286 is gone for good. Who to call.
Last checked Nov. 14, 2026. This page is refreshed weekly. Closure and project facts come from VDOT’s Northern Virginia news releases, 511 Virginia and the Fairfax County Department of Transportation.
Burke has no town public works department. The Virginia Department of Transportation maintains most public roads here, and Fairfax County builds some local projects. Here is what is closed or changed this week, the longer projects under way and who handles what.
Who to call
- Potholes, signals, signs, fallen trees on public roads: VDOT Highway Help Line, 1-800-367-7623 (1-800-FOR-ROAD), TTY 711, or my.vdot.virginia.gov
- Live closures and work zones: 511 Virginia, or dial 511
- County road projects: Fairfax County Department of Transportation, 703-877-5600
- Private and HOA roads: your association or property manager
Closed or changed this week
| What | Where | When | Detour or alternative |
|---|---|---|---|
| Greeley Boulevard closed to through traffic | Between Greenview Lane and Rolling Road, West Springfield | Since Oct. 21; west side of the intersection expected to reopen by late November | Rolling Road, Rivington Road and Greenview Lane |
| Left turn from westbound Burke Centre Parkway to southbound Fairfax County Parkway removed for good | Burke Centre Parkway (Route 643) at Fairfax County Parkway (Route 286) | Permanent since Oct. 26 | Eastbound Burke Centre Parkway, then southbound Route 123 (Ox Road) |
| Fairfax County Parkway Trail closed | Between Ladues End Lane and Fairview Woods Drive | Since Oct. 30, until summer 2027 | Braddock Road shared-use path to Route 123, then the Route 123 path to Burke Centre Parkway |
| Rolling Road lane shifts | Hunter Village Drive/Tanworth Drive to Kenwood Avenue | Until late 2027 | Lanes stay open in shifted positions |
| Backlick Road northbound right lane closed | Between Cabin John Road and Industrial Road, Springfield | Until July 10, 2027 | Expect delays |
Greeley Boulevard at Rolling Road
VDOT closed Greeley Boulevard (Route 3332) to through traffic between Greenview Lane and Rolling Road at 9 a.m. Wednesday, Oct. 21, for about five weeks, according to its Oct. 19 release. The intersection is in West Springfield, about two miles from Burke. Crews are working on the western side of the Rolling Road and Greeley Boulevard intersection for the Rolling Road widening. Homes on that stretch stay reachable, but drivers cannot turn directly between it and Rolling Road. Through traffic is detoured via Rolling Road, Rivington Road and Greenview Lane. VDOT expects the west side of the intersection to reopen by late November.
A second closure nearby, of Viola Street between Rolling Road and Flax Street, was set to start Oct. 27. VDOT postponed it and, when we checked Nov. 14, had still not set a new start date. Viola Street stays open until VDOT announces one. When it starts, VDOT says the closure will last about five weeks.
Burke Centre Parkway and Fairfax County Parkway
Since about 9:30 a.m. Monday, Oct. 26, the westbound Burke Centre Parkway left-turn lane to southbound Fairfax County Parkway has been permanently closed, and the two westbound right-turn lanes to northbound Fairfax County Parkway are now one, according to VDOT. To reach southbound Fairfax County Parkway, VDOT says to use eastbound Burke Centre Parkway and southbound Route 123 (Ox Road). The intersection is in Fairfax Station, about four miles west of Burke.
The Fairfax County Parkway Trail has been closed between Ladues End Lane and Fairview Woods Drive since Oct. 30 and stays closed until summer 2027. Walkers and cyclists are detoured along the Braddock Road shared-use path to Route 123, then the Route 123 path to Burke Centre Parkway, according to VDOT.
VDOT has also run overnight single-lane closures on northbound Fairfax County Parkway between Burke Centre Parkway and Nomes Court for bridge work, most recently Oct. 30 and 31. None was announced for the coming week as of Nov. 14. Check 511 Virginia before a late-night trip.
Coming up: Sydenstricker Road bike lanes
Fairfax County proposes bike lanes on Sydenstricker Road between Galgate Drive and Etta Drive, and a better crosswalk at Arley Drive, when VDOT repaves the road in 2027. A virtual meeting on the plan runs 7 to 8:30 p.m. Monday, Nov. 9, and comments are due Nov. 23. Nothing changes on the road until then. Our story has how to join and comment.
Projects in and around Burke
| Project | Who | Status |
|---|---|---|
| Rolling Road widening, Viola Street to Kenwood Avenue | VDOT | Under construction since February 2025; completion late 2027 |
| Fairfax County Parkway widening, Route 123 to Nomes Court/Ladues End Lane | VDOT | Under construction since April 2025; completion mid-2027 |
| Burke Road realignment, Parakeet Drive to Peregrine Drive | Fairfax County | Construction began March 2026; completion slated for September 2027 |
| Burke Centre VRE parking garage renovation | Fairfax County | Sept. 14 to February 2027; garage open, lanes may close |
| Braddock Road multimodal improvements, Humphries Drive to Ravensworth Road | VDOT | In design; first phase construction to begin fall 2030 |
Rolling Road widening
VDOT’s project page says the second phase widens about 1.5 miles of Rolling Road (Route 638) from two lanes to four between Viola Street and Kenwood Avenue, with a raised median, a shared-use path, a sidewalk and a new signal at Greeley Boulevard. Traffic shifts stay in place until late 2027:
- Hunter Village Drive/Tanworth Drive to Birmingham Lane: both directions share the west side of the road.
- Birmingham Lane to Kenwood Avenue: both directions share the east side of the road.
VDOT also schedules daytime lane closures on weekdays outside rush hours, and sidewalks and paths along Rolling Road may close with posted detours. The estimated cost is $83 million. Construction questions go to VDOT’s Adam Travers at 571-334-9572.
Fairfax County Parkway widening
VDOT’s project page says the work widens about two miles of Fairfax County Parkway (Route 286) from four lanes to six between Route 123 (Ox Road) and Nomes Court/Ladues End Lane. Construction began in April 2025 and is due to finish in mid-2027. The estimated cost is $126 million. Questions go to VDOT’s project line, 833-286-4111.
Burke Road realignment
The county’s project page says the work realigns Burke Road and raises the roadway to improve safety and cut flooding, with road reconstruction, new pedestrian and bicycle connections and a replacement drainage pipe under the road. It covers about 2,200 feet of Burke Road from Parakeet Drive to Peregrine Drive. The budget is $8.5 million. Construction began in March 2026 and is slated to finish in September 2027. The county page lists no current lane closures or detours; expect work zones on Burke Road until the project ends, and call the county at 703-877-5600 with questions.
Burke Centre VRE garage
From Sept. 14 to February 2027, the county is replacing the sealants in the Burke Centre VRE parking garage, according to Fairfax Connector. Commuters can still park there, but driving lanes may be closed. Follow posted signs and detours inside the garage.
Braddock Road multimodal improvements
VDOT’s project page covers three miles of Braddock Road (Route 620) between Humphries Drive in Burke and Ravensworth Road in Annandale, including the ramps to the southbound Capital Beltway. It adds new and upgraded shared-use paths on both sides of the road and access changes along the corridor. The project is in design and nothing is under construction. VDOT’s milestones:
- Phase 1 right-of-way acquisition, Southampton Drive to Ravensworth Road: fall 2027
- Phase 1 construction: fall 2030
- Phase 2, Humphries Drive to Southampton Drive, the stretch nearest Burke: to be set when more funding is available
The estimated cost is $189.1 million for both phases.
Who maintains your road
Fairfax County’s road maintenance page says any road with a route number, such as Fairfax County Parkway (Route 286), is a VDOT road. That covers Burke’s main roads: Burke Lake Road, Old Keene Mill Road, Rolling Road, Burke Road and Braddock Road. Many neighborhood roads in HOA communities are private. If you are not sure who owns a street, VDOT will tell you at 1-800-367-7623, and the county’s road maintenance map shows responsibility street by street.
How to check closures before you drive
- 511 Virginia: live incidents, work zones, lane closures and traffic cameras on state roads, on the web, in the app or by dialing 511.
- Fairfax Alerts: county emergency and traffic notices by text or email.
- Fairfax County transportation projects: the full list of county projects.
- VRE service alerts: for the Burke Centre and Rolling Road stations.
Related guides
Frequently asked questions
Is Greeley Boulevard closed at Rolling Road?
Yes. VDOT closed Greeley Boulevard to through traffic between Greenview Lane and Rolling Road on Oct. 21 for about five weeks, with the west side of the intersection expected to reopen by late November. The detour uses Rolling Road, Rivington Road and Greenview Lane.
Can I still turn left from Burke Centre Parkway onto southbound Fairfax County Parkway?
No. Since Oct. 26 the westbound Burke Centre Parkway left-turn lane to southbound Fairfax County Parkway is permanently closed. VDOT says to use eastbound Burke Centre Parkway and southbound Route 123 (Ox Road) instead.
Who fixes potholes on Burke roads?
Most public roads in Burke, including any road with a route number, are maintained by VDOT. Report problems at my.vdot.virginia.gov or 1-800-367-7623. Private and HOA roads are maintained by their owners.
When will the Burke Road realignment be finished?
Fairfax County says construction began in March 2026 and is slated for completion in September 2027. The $8.5 million project rebuilds about 2,200 feet of Burke Road between Parakeet Drive and Peregrine Drive.
How do I check road closures near Burke?